Model No.: LP-39
Heat Treatment: Quenching
Tolerance: 0.5mm, Machining: 0.05mm, Finish Machining: 0.005mm
Forging Parts Weight Range: 0.50kgs - 80kgs
Mold Time: 35 days
Shipping Date: 45 days after receiving the deposit
Trademark: LP/OEM
Transport Package: Wooden Box
Specification: C45
Origin: China
HS Code: 7307910000
We also supply a wide range of components for various systems such as engine parts including connecting rods, TDCI, fuel injectors, rockshafts, turbine disks, and flywheel panels. For transmission systems, we offer wheel gears, output shafts, clutch linings, and final drive hubs. Our train-bridge system includes spline shafts, cardan joints, flange yokes, and sleeve forks. We also provide bent axles, camshafts, and hubs for transmission systems, as well as steering knuckles, steering arm shafts, and control arms for steering systems.
In the suspension and shock mitigation systems, we deliver iron teeth, lifting lugs, set bars, latch hooks, top and bottom yoke plates, and draft arms. For air conditioning and exhaust systems, we supply turbines, vortex plates, and flanges. Engineering parts include track link sections, oil cylinder accessories, crawler accessories, forklift truck beams, bolt seats, joint bearings, and shaft blocks.
Our railway parts consist of press plates, depression bars, and turnouts. Agricultural mechanization systems feature three-point linkages, tool bits, shaft blocks, and link joints. We also offer scaffolding components like bowls and cotter pins. SAE flanges are suitable for use in ships, metallurgy, offshore oil, hydraulic tubing, and engineering machinery.

Production Description:
Forging Part Weight | 0.50kgs - 80kgs |
Machining Processes | Turning, cutting, milling, grinding, drilling, reaming, threading |
Tolerance | 0.5mm, Machining: 0.05mm, Finish Machining: 0.005mm |
Surface Treatments | Shot blasting, painting, chrome plating, oiling, spraying, galvanization |
Materials | Carbon steel, stainless steel, alloy steel, aluminum alloy, copper, etc. |
Production Process | Die forging, stamping casting, heat treatment, shot blasting, deburring, machining, surface treatment, packing, all according to your request. |
(Made according to customers' drawings, specifications, and/or samples) | |
Specification: OEM & Custom Based on Drawings or Samples |
Please send us your drawing or samples, and we will provide you with our best price and service.

Equipment:
Tooling Workshop: FV-2215 Machine Center, CNC Machine Center, CNC Milling Machine, Electric-Spark Processing Machine
Forging Workshop: 1000T Friction Press, 630T Friction Press, 400T Friction Press, 500T Cutting Machine, Sawing Machine, 630T Hot Press Forging Automatic Line, Circular Saw, 1600T Hot Press Forging Automatic Line, 5T Hydraulic Die Forging Hammer
Machining Workshop: THMC6350 Machining Center, HAAS CNC Machining Center, LGMAZAK CNC Lathe, CKA6180A
Heat Treatment Equipment: Chained Continuous Atmosphere Protective Quenching & Tempering Furnace, Isothermal Normalizing Furnace
Testing Equipment: Groma08.10.06 CMM, JB-300B Impact Testing Machine, WAW-300G Hydraulic Universal Tester, 4XC-V Metallurgical Microscope, LAB SPARK750 Spectrum Analyzer, HB, HRC, Ultrasonic Flaw Detector, Magnetic Particle Detector, Profile Projector, Profile Meter + Roughness Tester, Roughness Tester, Deflection Tester

Packing and Delivery:
1. Original Packing: Anti-rust Bag – Box – Carton – Wooden Case (Customized as per your requirements)
2. Delivery Time: 3–7 days for stock orders and 30–60 days for production
3. Delivery Methods: Small quantities by TNT/DHL/FEDEX or other competitive air express; large quantities by sea shipment

Why Choose Us?
1. 24 years of experience in the forging industry.
2. A team of skilled workers with over 10 years of experience.
3. Advanced and well-equipped production and testing facilities.
4. Annual production capacity of 15,000 tons.
5. Certifications: ISO14001:2004, OHSAS18001:2007, ISO/TS 16949:2009, Lloyd's Register, GL Certificate.
6. Full production chain from mold design, forging, heat treatment, to mechanical processing.
7. Sign confidentiality agreements to protect your intellectual property.
8. Select high-quality material suppliers, 100% inspection at each production stage, strict quality control, and excellent customer service.
9. One-year warranty and long working life.
10. Professional pre-sales, sales, and after-sales support.
11. One-stop service—supply various spare parts to save your time when you need them urgently.
12. Competitive pricing and timely delivery.

FAQ
Q: Are you a trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Typically, it takes 30–60 days after receiving your advance payment. The exact time depends on the items and quantity of your order.
Q: Do you provide samples? Are they free or paid?
A: Yes, we can provide samples for free, but you will be responsible for the freight cost.
Q: What about the mold fee?
A: We can refund the mold fee once your order reaches our standard quantity.
Q: What are your payment terms?
A: For payments under $5,000, 100% in advance. For payments over $5,000, 30% T/T in advance, balance before shipping.
Q: What are your delivery terms?
A: EXW, FOB, CFR, CIF, DDU.
Q: Can you produce according to samples?
A: Yes, we can produce based on your samples or technical drawings. We can also build molds and fixtures. If you have any other questions, feel free to contact us below.
electric vehicle charging station,ev station,ev car charging stations,evse charging station
Xuchang Shuoniu New Energy Technology Co., Ltd. , https://www.shoniu.com